The following renovations and upgrades are proposed for the 150 Central Park project. Replace the existing single pane windows to double glazed on the south wing of the building. Reconfiguring the window to wall ratio at the south wing of the building. Re-cladding the south wing of the building to improve energy performance. Replacing 8 existing drop off parking spaces with 2 lay by spaces for clinic drop off. Addition of new windows to the north façade to allow natural light in the space. Repai
Follow this development
Get an email when the status changes — approvals, hearings, decisions.
✓ We'll email you when something changes at 011-150 CENTRAL PARK DR.