Proposed building expansion and off site parking lot
NOTE: Site Plan Waiver Issued for (only for: Removal of one accessible parking space and bicycle space from 115 Sun Pac, resulting in an increase from 160 to 161 parking stalls; Reinstating the bicycle parking at 135 Sun Pac; Installations of three (3) accessible parking stalls to the south of teh building and reconfiguration of teh two (2) existing accessible stalls; Installation of a concrete walkway around the north and eastern perimete
Follow this development
Get an email when the status changes — approvals, hearings, decisions.
✓ We'll email you when something changes at 115 and 135 Sun Pac Blvd..