ADDITION: On the Ground floor & second floor towards the rear side of the existing building AND on top of basement crawl space under the Proposed first-floor area.
ALTERATIONS: Within the existing floor space at the First and Second floor levels.
Proposed new septic bed at the same location as existing.
Follow this development
Get an email when the status changes — approvals, hearings, decisions.
✓ We'll email you when something changes at 19 FARINA DRIVE.