WPOC Phase 3 Site Development and Alteration project which includes the following:
• Regrade and pave the existing parking lot and driveway on the northwest corner of the site.
• Mill and pave the driveway entrance off Chrysler Drive.
• Creation of a new parking lot and driveway.
• Regrading and paving the existing contractor truck parking area and install approximately 24 new plug-in block heaters. Each block heater shall have 2 outlets of capable of heating 2 trucks simultaneously.
• Constru