As part of the fully executed Site Plan Application, the full build-out of facility was approved. The Client proposed to build the facility in phases and phase 2 was approved as part of previous Site Plan Applications (Limited). The current Site Plan Application (Limited) is for phase 3 of project, which includes building steel structure for installation of 2 nos. prefabricated Power Skids and Generator enclosures, with minor regrading as noted. The updates since previously approved SPA are note