Installation of a 2 MW battery energy storage system (BESS). The BESS will be located in the existing trailer loading area. It will consist of electrical equipment for the storage and distribution of electricity, including batteries, an inverter, a transformer and the required control system. The BESS footprint will be approximately 2184 sqf. All electrical equipment will be located on the standard concrete pad foundations.
Follow this development
Get an email when the status changes — approvals, hearings, decisions.
✓ We'll email you when something changes at 9500 MCLAUGHLIN RD N.