Site Plan Approval

97 WALKER DR

Filed 2021-09-29 · Brampton · Site Plan Approved
Application type
Site Plan Approval
Address
97 WALKER DR
Date filed
2021-09-29
Status
Site Plan Approved
Maple Leaf Foods is proposing to extend their concrete loading area to the project west end of the site to aid in truck maneuverability. A concrete curb and retaining wall are also proposed. This is a small area and changes to the design are minimal. Revised Drawing Set and SWM Brief are submitted to support the limited Site Plan application.

Want to know about new development filings near your home before the signs go up?

Send us feedback
Your feedback goes directly to the founder.