The design involves over-cladding the existing building with a BIPV (Building Integrated Photovoltaic System) which will generate electricity. New triple pane windows will be installed in existing openings made taller. An entrance canopy will be added to the west façade. A complete interior renovation is part of the project. The building will undergo a fuel switch from natural gas to electricity to achieve Zero Carbon Building certification. Air source heat pumps and a PV array will be added to
Follow this development
Get an email when the status changes — approvals, hearings, decisions.
✓ We'll email you when something changes at A-10 PEEL CENTRE DR.